Exclusive WA Distributor · Tsundoku

Fossil
fuels
are for
dinosaurs

STEG is a WA-based off-grid energy specialist offering generators, hybrid systems, distribution and fuel storage solutions to many of Australia’s largest construction, mining, industrial, oil and gas, and rental companies.

6 kVA—1.5 MVA

Range

Branches

Perth - Karratha

Staff

40+

02 · Product Range

Who we are.
Product Range

STEG is the proud and exclusive WA Distributor for the Tsundoku range of energy equipment. From Hybrid Energy systems, to optimised diesel power stations and distribution, STEG offers a complete ecosystem of cost and carbon reducing off grid energy products.

Purple LABS
01
Purple Labs

Hybrid Systems.

View Spec Sheet →
Aston Electric
02
Aston Electric

Optimised Diesel.

View Spec Sheet →
Fuchtardt
03
Fuchtardt

Standby Systems.

View Spec Sheet →
SUMO
04
Sumo

Distribution.

View Spec Sheet →
Pirate
05
Pirate

Fuel Storage.

View Spec Sheet →
03 · Supply chain horsepower

What we do.
Complete supply chain in-house

STEG owns its entire supply chain so your job never stops. From design and engineering to electrical and mechanical trades and even our own fleet of delivery vehicles. STEG can design, install, support and freight turnkey off grid energy systems across WA.

T-01
Design
Load surveys, hybrid architecture, single-line diagrams.
T-02
Engineering
In-house electrical & mechanical engineering. Stamp-grade.
T-03
Mechanical
Fabrication, civil works, containerisation, fuel systems.
T-04
Electrical
High-voltage, low-voltage, commissioning, energisation.
T-05
Transport
Own fleet. Over-size, remote, road-train capable.
T-06
Installation
Turnkey. Pad to power-on, sequenced around site shut.
T-07
Maintenance
Scheduled servicing, OEM-backed, parts-in-stock.
T-08
Field Service
24/7 response. SLA-backed from Perth & Karratha.
T-09
Spare Parts
WA-held inventory. No intercontinental wait-times.
04 · case studies

What we've done
Case studies

CASE STUDIES – STEG has proudly partnered with some of Australia’s largest brands in delivering cost and carbon savings in off grid applications. We have over 150 live sites across Australia.

Case Study · 01

Cube MAX in action — Melbourne: 2 year deployment.

This Purple CUBE Max is coupled with an Aston Electric XL400 fuel-optimised diesel generator powering a major site compound on one of Victoria's largest infrastructure projects. The CUBE is also taking in solar energy from the site's pre-existing 96kW rooftop solar, further reducing operating costs.

Client
Tier 1 Infrastructure Contractor
Location
Melbourne, VIC
Equipment
Purple CUBE Max + Aston Electric XL400
Contract
Rental · 24-month term
Results
22hr
Reduced Diesel
per day
−8,020
Engine Operating
hrs over 12 months
32
Services Reduced
per annum
92%
Reduction
in carbon
Case Study 1
Case Study · 02

Purple POD in action — Queensland 12 month deployment.

This Purple POD Core unit was recently deployed for a 12 month period powering portable buildings on a tier one construction site in Queensland. The unit was used in place of a 20 kVA diesel generator and delivered typical outstanding cost and carbon savings to the site.

Client
Tier 1 Construction Contractor
Location
Queensland
Equipment
Purple POD Core
Contract
Rental · 12-month term
Results
22hr
Reduced Diesel
per day
−740
Engine Operating
Hours per annum
32
Services Reduced
per annum
80%
Reduction
in carbon
Case Study 2
Case Study · 03

Purple Skidibee in action — Pilbara: permanent deployment.

The above Skidibee array is one of 2 such installations in the North West of WA. The Skidibees feed 2 x Purple POD MAX compact hybrid systems, providing diesel-free operation of sensitive electronic monitoring equipment to a tier 1 miner. The Skidibee-Purple POD combo has reduced diesel operation at the remote sites to zero, whilst ensuring redundancy in the case of a prolonged weather event.

Client
Tier 1 Miner
Location
Pilbara, WA
Equipment
Skidibee Array + Purple POD MAX × 2
Contract
Permanent Installation
Results
0
Diesel Operation
reduced to zero on site
2
Installations
North West WA
100%
Diesel-Free
normal operating conditions
100%
Redundancy
prolonged weather events
Case Study 3
05 · Modoken

Remote monitoring.
Remote control
Automated reporting

A single accountable entity across design, supply, install, monitor, maintain and renew — de-risking procurement and lifecycle cost in one signature.
P-01
Consumption.

kW, kWh, fuel, renewables — per-source, per-second. The foundational data layer for everything else.

P-02
Cost.

$/kWh, in real time. Every kilowatt priced. Every saving proven. The commercial scoreboard.

P-03
Carbon.

Scope-1 emissions, calculated from real consumption. Audit-grade, reporting-ready.

P-04
Control.

Remote dispatch, set-point control, fault alerts. The platform operates the asset, not just observes it.

01
Design
Load survey, architecture, single-line.
02
Supply
Factory-direct, no margin stack.
03
Install
Turnkey site delivery.
04
Monitor
Modoken from day one.
05
Maintain
SLA-backed, own techs.
06
Renew
Buyback & upgrade path.
06 · Contact

Contact our
Team anytime

The economics have moved. The technology has arrived. The only question for tier-one operators is how fast they want to transition — and who they want at their side when they do. STEG is ready when you are.

· Contact Form
Karratha
4 Exploration Drive · Gap Ridge Industrial Estate
Pilbara · North
Perth
Unit C, 52 Murray Road North · Welshpool
Metro · South · Goldfields
KARRATHA
Gap Ridge
PERTH
Welshpool